New addition and greenhouse update

Work starts back up again tomorrow and the jobs I had down to complete are nowhere near finished. Oh well, Rome wasn’t built in a day… Progress on the greenhouse timber frame has been slow, however, one bent is finished, ridge pole for the roof rough cut and one tenon done and second bent well under way. Tano-Li, my little padawan has been ever floating around the workshop area finding jobs to do. He came in the other day, said he wanted to help, grabbed the broom and started sweeping up! I then gave him a few little jobs to help with and we both had a great time 🙂 Kobe-Li then got in on the action and so I stopped what I was doing (ran out of little jobs) cut up a few off cuts and pre drilled these for the boys:

These were cut out of off-cuts and pre-drilled for the boys to put together.

They had a great time putting them together, using a cordless drill, and sanding down the edges!

Tano-Li has also helped with the framing:

Tano-Li making sure the shaping was square and true.

Bit blurry sorry – bad light. This is the first bent finished. The rafters are cut and shaped ready to fit once the whole thing goes up.

I decided to bolt the frame together rather than timber pegs, just for that added bit of security and due to time constraints. Once this whole thing is up it is going to look awesome!

We have also received delivery of a belted galloway 6mth old steer to grow out. Won’t be for another 18 months before we process him, but I am sure it will be well worth the wait 😉

He is fitting in well with the others after a tentative day.

Lastly, I caught sight of a massive – read freaken huge – fox down by the dam the other morning (9am), so it was time to sure up the chicken pen with hot wire. The chicken pen now looks like Fort Knox, hot wire above, between and 10cm off the ground to stop digging – and yes the hot wire does work….

Hot wired chook pen., will definitely keep Mr Fox away!

Advertisements

2 thoughts on “New addition and greenhouse update

  1. Bummer. I knew that I should have visited yesterday. Missed all the action. Better start buying tools from the Big B for the boys! 🙂

  2. Hah, Tano-Li asked me to build him a workshop! That will be the next project after the green house 🙂

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s